Demolition design and permits: we handle them for you

Demolishing a load-bearing wall or cutting an opening in it is an alteration of the load-bearing structure, so a design and a permit are required. We prepare the documents, obtain the permit and carry out the work.

  • 5,0 paslaugos.lt
  • 15+ years of experience
  • Price in the contract
  • We reply within 1 working day
Wide opening in a load-bearing wall with a steel frame
When a permit is needed

Partition wall or load-bearing wall?

Non-load-bearing partition wall. Demolishing it is usually classed as simple repair work, so no permit is needed. We still check that the wall really is non-load-bearing: in panel-block buildings this is not always obvious.

Load-bearing wall. Demolishing it or cutting an opening in it alters the building's load-bearing structure. This requires a demolition (major renovation) design and a building permit, and in a block of flats usually also the consent of the other owners or the residents' association.

The specific requirements depend on the building and the work. We tell you exactly what your case needs after the site visit.

Why it is not worth demolishing without a permit

  • Illegally altered structures can endanger the whole building
  • When selling the flat, the alterations will not match the cadastral records
  • Neighbours or the residents' association may demand that the wall be reinstated
  • The building control authority may impose a fine

What you get from us

  • Assessment of the wall and structure
  • The structural survey and calculations
  • A demolition design
  • Help with collecting consents and obtaining the building permit
  • Demolition with beams or a steel frame
  • If you wish, a turnkey fit-out of the flat
Step by step

How a load-bearing wall is demolished

Six stages, and we carry out or organise every one of them.

  1. Site visit and structural assessment

    We establish whether the wall is load-bearing, what it is made of, what rests on it and whether it can be removed or the opening widened.

    Done by us
  2. Structural survey and calculations

    The engineer calculates which beams or steel frame will be needed in place of the wall.

    We organise it
  3. Demolition design

    We prepare the design required to legally alter load-bearing structures.

    We prepare it
  4. Consents and permit

    In a block of flats we help collect the consent of neighbours or the residents' association and obtain the building permit.

    We take care of it
  5. Demolition and reinforcement

    We temporarily prop the floor slab, install beams or a steel frame, demolish the wall and remove the waste.

    Done by us
  6. Finishing and completion

    We finish the opening, fit out the whole flat turnkey if required, and hand over the documents.

    Done by us
How the work proceeds

How we work

  1. Conversation

    We call you back within one working day, find out what you need and arrange a site visit.

  2. Site visit

    We visit the site or assess it from drawings and photos. Free of charge.

  3. Estimate and contract

    An estimate with quantities and a list of what it does not include. The contract sets out the price, stages and deadline.

  4. Works

    The site manager organises the tradesmen and materials, and you always know what is happening on site.

  5. Handover

    You accept the work under a handover certificate and receive the documents and warranty.

You pay in stages, for work already completed. Additional work is agreed in writing before it starts.

FAQ

Frequently asked questions

How long does the permit take?

It depends on the building, the consents and the municipality. We tell you the timeframe after the site visit, and while we wait we can carry out work that doesn't need a permit.

How much do the design and permits cost?

The price depends on the wall, the building and the calculations required. We tell you after the site visit, together with the demolition estimate.

Do I need the neighbours' consent?

In a block of flats, altering load-bearing structures usually requires the consent of the other owners or the residents' association. We help you collect it.

Can you prepare only the design and let someone else do the demolition?

We can, but most clients prefer everything in one place: then the same team is responsible for both the design and the work.

Enquiry

Tell us about your project

We reply within one working day. The site visit and estimate are free.

Call us+370 624 52233
Write to usinfo@vpstatyba.lt

Get a quote within 1 working day

Your name and phone number are enough. The other answers will help us prepare for the conversation.

What are you planning?
Property
Area
Do you have a design or drawings?
When would you like to start?
WhatsApp
CallGet a quote